# Gantt chart: scheduling tasks on a timeline

> Schedule tasks on Beebole's Gantt chart — drag bars to set dates, link dependencies, customize columns, and spot overload with the workload heatmap.

Beebole's Gantt chart displays your [tasks](https://beebole.com/help/documentation/planning.md) as bars on a timeline, so you can see start and end dates, sequence work with dependencies, and spot scheduling overload at a glance. It is one of the four views of the **Planning** page, alongside the [Kanban board](https://beebole.com/help/documentation/kanban.md), the [Staffing view](https://beebole.com/help/documentation/staffing.md), and the [List view](https://beebole.com/help/documentation/task-list.md) — all show the same tasks, so a change in one view appears instantly in the others.

***

## Opening a Gantt view

**1. Open the Planning page**

Click **Planning** in the sidebar. Pick the planning you want at the top of the page.

**2. Select a Gantt view**

Click a Gantt view tab above the task list. To create another one, click **Add a view** and select **Gantt chart** — each view keeps its own columns, grouping, and scale.

***

## Reading the timeline

Each task with dates appears as a horizontal bar running from its start date to its end date, in the task's color. Task names show their full project and task path, so tasks with similar names are easy to tell apart. In a planning set to **Bookings**, each bar is a booking named after its project and person — see [Tasks or bookings](https://beebole.com/help/documentation/planning.md#tasks-or-bookings). A vertical line marks today, and the timeline extends as you scroll — right into the future, left into the past — with a **Today** button to jump back to the current date.

![Beebole Planning page for Main plan on its Gantt view: the Row # and Task Name columns on the left, and on the timeline one colored bar per task with dates, dotted arrows linking dependent tasks, month pills for September to December 2026, a load bar under each week number, and an orange vertical line marking today](https://mintcdn.com/beebole/VvwXLNSbW6lCPUHt/help/images/gantt/timeline-bars.webp?fit=max\&auto=format\&n=VvwXLNSbW6lCPUHt\&q=85\&s=8675c12ce64c7c80ea0b77d6f0775c20)

The Gantt view of Main plan, week by week, with dependency links and today's line

Hover any bar for a rich tooltip: the full dates, the task name, its project with parents, the owner, the planned hours or days and allocation percentage, plus a hint about what **⌘** does on the chart.

Where one month ends and the next begins, the timeline draws a vertical line across the chart and a pill above it with the month and year, so you keep your bearings while scrolling a long stretch of days or weeks.

### Choosing the period

Open the **⋯** menu on the active view tab and use **Period** to choose how the timeline runs:

* **Infinite by day** or **Infinite by week** — the endless scrolling timeline, at day or week granularity.
* **Day**, **Week**, **2 weeks**, **3 weeks**, **4 weeks**, or **6 weeks** — the chart fits that window to your screen and lists only the tasks that fall inside it (parent tasks are kept).

![Beebole Gantt view tab menu with Period, Durations in, Columns, Group by, Dependent tasks, Filters, Rename, Duplicate and Delete, and the Period submenu listing Infinite by day, Infinite by week (checked), Day, Week, 2 weeks, 3 weeks, 4 weeks and 6 weeks](https://mintcdn.com/beebole/VvwXLNSbW6lCPUHt/help/images/gantt/view-period-weeks.webp?fit=max\&auto=format\&n=VvwXLNSbW6lCPUHt\&q=85\&s=c28a0ddf4b1ac34959a159af6f9c6baf)

The view tab's menu open on Period

With a fixed window, the view pages one period at a time: swipe or scroll sideways and it snaps cleanly onto the next or previous window, and the period containing today is always reachable. The period's dates sit on the left of the view tabs. Click them to pick another window.

To reuse a window's schedule, click the copy button next to the period's dates (**Copy this period and go to another period to paste it**). Go to any other window of the same planning, click the paste button that appears beside it (**Paste the copied period**), and pick **With people** or **Without people**. The dated tasks of the copied window land in the window on screen, and a copy shorter than that window repeats until it is full. See [Copying a period](https://beebole.com/help/documentation/staffing.md#copying-a-period) for the details.

With a fixed period, tasks that start before or end after the window are drawn cut off, with a dashed edge and a chevron — click it and the window moves onto the hidden start or end date, scrolling smoothly to the bar. Cut edges can't be resized, since the date they would move isn't on screen.

> [!NOTE]
>
> Tasks without dates still appear as rows in the task list — they just have no bar yet. See below for how to schedule them directly on the timeline.

### Zooming in and out

Click a cell in the timeline header to zoom one level into that period: from the endless timeline down to the multi-week window you last chose (when it is longer than a week), then to a single week, then to a single day. Hovering the cell first previews the stretch of timeline the click will fill.

To go the other way, use the zoom-out button next to the period's dates, on the left of the view tabs. It names the level it will take you back to (**Day**, **Week**, **2 weeks** and so on, or ∞ for the endless timeline).

***

## Scheduling tasks on the timeline

* **Give a task dates** — In the row of a task that has no dates yet, click the timeline to create a bar spanning that cell, or click and drag to draw the exact period you want. Dragging on the row of a task that already has dates scrolls to its bar and flashes it instead.
* **Move a task** — Drag its bar left or right. The duration is preserved.
* **Resize a task** — Drag the left or right edge of the bar to change the start or end date. The planned time follows the new dates, at the same allocation.
* **Resize and keep the planned time** — Hold **⌘** (Alt on Windows/Linux) while dragging an edge. The task keeps its **Planned** time, and its allocation adjusts to the new dates instead: wider dates lower it, narrower ones raise it. The bar stops shrinking at the dates that hold its planned time at 100%. Grab the edge of a selected bar to do this for every selected task at once.
* **Work on several tasks at once** — Select several bars, then drag them together to reschedule the whole group in one move, hold **⌘** (Alt on Windows/Linux) while dragging to drop dated copies, or grab any selected bar's edge to shift every selected bar's dates by the same amount. Press **Delete** (or **Backspace**) to remove the whole selection at once. Each batch is a single undo step.

While you drag, Beebole shows the new dates live — and tasks linked by [dependencies](#task-dependencies) follow the drag on screen before you drop. Changes are saved automatically when you release the bar.

If the task's planned time no longer fits the new period, the task detail panel flags the overflow and offers one-click fixes — see [scheduling dates and planned time](https://beebole.com/help/documentation/planning.md#scheduling-dates-and-planned-time).

***

## Giving a task hours

A task normally runs over whole days. To pin it to exact times instead, open the task's **Task details** panel and uncheck **All day** — the hint on the checkbox says it plainly: *The task runs over whole days. Uncheck to set the hours it starts and ends.*

**Start time** and **End time** fields appear, pre-filled from the owner's own working hours, and the task now stretches on the clock rather than by whole days:

* Dragging, resizing, splitting, and copying the task keep its hours.
* Typing a figure in **Planned** reflows the task to the exact minute the owner's calendar can hold that work — skipping their scheduled breaks, days off, public holidays, and time off — and rolls to the next working day only when the current one runs out of hours.
* The capacity a timed task consumes is measured on the hours it actually spans, so a two-hour task no longer counts as a whole day against its owner's [workload](#workload-heatmap).
* On the [Staffing](https://beebole.com/help/documentation/staffing.md) timeline, the bar is drawn at its real position inside the day column, with non-working stretches hatched behind it.

Times that fall outside the owner's working hours are highlighted in the **Task details** panel, with a tooltip naming the reason — **Owner's schedule starts at …**, **Owner's schedule ends at …**, **Owner's schedule pauses from … to …**, or **Owner's schedule has no working hours that day**. When a day simply cannot hold the planned work, Beebole says **Not enough working hours on …**.

![Beebole Task details panel of a booking with All day unchecked, the start time 3:00 PM and the end time 6:00 PM highlighted in yellow, Planned in days, Plan on non-working days and the Backlog status](https://mintcdn.com/beebole/1biup-DWiGMrconJ/help/images/gantt/task-period-timed.webp?fit=max\&auto=format\&n=1biup-DWiGMrconJ\&q=85\&s=c62e2a7d72fd1c529faa5c70dd3b8f26)

A task pinned to 3:00 PM to 6:00 PM: the end time is highlighted because the owner's day ends at 5:00 PM

> [!NOTE]
>
> Moving the anchored edge of a period slides the whole period instead of collapsing it — a task set to run 08:00–12:00 and moved to start at 18:00 becomes 18:00–22:00.

To keep a task on weekends and public holidays instead of moving it to the next working day, check **Plan on non-working days** in the same panel. See [scheduling dates and planned time](https://beebole.com/help/documentation/planning.md#scheduling-dates-and-planned-time).

> [!TIP]
>
> A parent task has no dates panel of its own — its dates are the span of its subtasks. Set hours on the subtasks instead.

***

## Task dependencies

Dependencies sequence tasks: a dependent task is expected to follow the tasks it depends on. Dependency links are drawn between the bars on the timeline, color-matched to the tasks at each end, and they follow the bars live while you drag. The lines route around the bars they pass and around group header rows, so a link stays readable in a crowded chart instead of running straight through a bar.

### Drawing a link on the timeline

Hover a bar and a chain-link handle appears on the half of the bar you are pointing at — the start or the end. Both work the same way, in opposite directions, and the handle's tooltip says which one you have: **Link the end of this task**, then *Drag onto a task, or click the tasks that start after it (hold ⌘ for several)*.

* **Drag** the handle onto another task and release to create the link.
* **Hold ⌘ as you release** to keep the handle armed, so you can chain several tasks one after another without grabbing it again.
* **Release the handle where it is** and it stays armed instead: click tasks in the list to link them, and click again to finish.
* While a handle is armed, tasks already linked to it wear a broken-chain mark — click one to remove that link.

![Beebole Gantt chart with a dotted link line running from the end of the App Development bar to the QA Testing bar, whose row is highlighted as the drop target](https://mintcdn.com/beebole/PNc0aLhj1gS9JUQ3/help/images/gantt/dependency-drag.webp?fit=max\&auto=format\&n=PNc0aLhj1gS9JUQ3\&q=85\&s=bbe53a50877d7b14aa80193f5aecf7ee)

The end handle of App Development dragged onto QA Testing, before the release

### Adding dependencies from the column

Dependencies are also managed in the **Dependencies** column — add it from the **Columns** menu if your view doesn't show it.

**1. Click the task's Dependencies field**

Click the **Dependencies** cell of the task that should come after. This activates dependency mode.

**2. Pick its dependencies**

Click the task it depends on directly in the list — hold **⌘** to select several — or type the row numbers (from the **Row #** column) into the field, separated by commas.

**3. Finish**

Click elsewhere or press **Esc** to leave dependency mode. Arrows now link the bars on the timeline.

To remove a dependency, edit the row numbers in the **Dependencies** field. A task cannot depend on itself.

### How dependent tasks move

Open the **⋯** menu on the active view tab and hover over **Dependent tasks** to choose what happens to dependent tasks when you move a task they depend on. The submenu is titled **Dependent tasks movement options**, and each option animates on hover so you can see the behavior before picking it:

| Option | Behavior when the predecessor moves |
| - | - |
| **Free** | Dependent tasks stay where they are |
| **Pushing** | Dependent tasks are pushed later when the predecessor would overlap them |
| **Together** | Dependent tasks move along with the predecessor, keeping their distance |

The setting belongs to the planning, not to the view, so it applies to every Gantt and Staffing view of that planning. The same submenu is available from a [Staffing view](https://beebole.com/help/documentation/staffing.md) tab.

Whichever option is active, a task that gets rescheduled lands on dates its own owner actually works: its start rolls forward (or back) to the next working day on that person's [work schedule](https://beebole.com/help/documentation/work-schedule.md), and its end shifts by the same amount. What the period holds depends on the view's **Durations in** setting. In **Hours**, the period is refitted to hold the same working time at its new position, so the planned hours never change. In **Days**, the task keeps the same number of working days, and its planned hours follow what those days hold.

***

## Planned time

The **Planned** column shows each task's planned work. The small button in the column header toggles the unit (**Planned in hours or days**); the same choice sits under **Durations in** (**Hours** or **Days**) in the view tab's **⋯** menu. A parent task shows the total planned time of its subtasks.

![Beebole Gantt task columns Row #, Task Name and Planned, with the H unit button in the Planned header and planned hours for the first ten Main plan tasks, from Requirements Gathering at 80 to Data Audit at 40](https://mintcdn.com/beebole/PNc0aLhj1gS9JUQ3/help/images/gantt/planned-column.webp?fit=max\&auto=format\&n=PNc0aLhj1gS9JUQ3\&q=85\&s=4b5ea62e674b9ce5306290e00e0a2211)

The Planned column in hours, with its unit button in the header

Switching to days does not divide hours by a fixed day length. A task's planned days are the working days its dates cover on its own calendar — the owner's [work schedule](https://beebole.com/help/documentation/work-schedule.md), or the company's when the task has no owner yet — at its allocation, whatever the length of each day: a 6-hour Friday counts as one day, the same as an 8-hour Monday. The hours follow the days: they are what those working days hold at the allocation. Typing a number of days in the **Planned** cell sets the allocation when the task's dates hold that many working days, and stretches the task at 100% when they hold fewer. The **Planned** cell, the bar tooltip, the live figure shown while you drag, the [workload heatmap](#workload-heatmap), and [Staffing](https://beebole.com/help/documentation/staffing.md) capacity all count days this way, so their day figures always agree.

Planned time is what the [workload heatmap](#workload-heatmap) compares against each person's capacity, derived from their [work schedule](https://beebole.com/help/documentation/work-schedule.md) minus their absences.

***

## Workload heatmap

When the chart is grouped, each group header row carries one cell per period (day or week, following the current **Period** granularity). What the cell draws depends on what you grouped by.

* **Grouped by Owner** — Each owner's row shows a load bar comparing that person's planned time to their capacity for the period. The bar fills red while capacity remains, turns green when the capacity is met exactly, and turns purple as soon as the person is booked beyond it, with the overload share in a darker purple.
* **Grouped by anything else** — For project categories, tag categories, statuses, and the "no owner" bucket of a grouping by owner, the cell shows the group's total planned time as a figure above a bar scaled to the busiest period on that row. A capacity ratio has no meaning for a group of people, so none is drawn. Planned time that has no owner yet appears as a small red badge in the corner of the cell.
* **Without grouping** — A single load bar sits under each day or week number in the timeline header, rolling up everyone. Click it to step the scroll through the rows driving that period's load.
* **Hover for details** — A tooltip names the period, then the planned time against capacity (for example `Planned: 32 / Capacity: 40 (80%)`, in your organization's duration format), and adds a line per overloaded person with their own figures.

![Beebole Gantt of the Main plan grouped by Owner, with weekly load bars on the James Chen, Liam O'Brien and Sophie Laurent header rows, red where capacity remains and purple where Sophie Laurent is booked beyond it, and a tooltip reading 03-10, Planned: 122.44 / Capacity: 40 (306%)](https://mintcdn.com/beebole/VvwXLNSbW6lCPUHt/help/images/gantt/workload-heatmap.webp?fit=max\&auto=format\&n=VvwXLNSbW6lCPUHt\&q=85\&s=de8d3457f8bd9c89e6d1f3b698607a12)

Grouped by Owner: load bars per week, and the tooltip of an overbooked week

Use the heatmap to spot the weeks where an owner is overbooked, then move bars or planned time to rebalance.

***

## Columns

The left panel of the Gantt chart is a configurable table. Open the **⋯** menu on the active view tab and hover over **Columns** to show or hide columns. **Row #** and **Task Name** are always visible — a new Gantt view starts with just those two.

![Beebole Gantt view tab menu with Columns hovered and its submenu listing Activity, Client, Dates, Dependencies, Internal, Occupation, Owner, Planned, Potential owners, Status and Tags, each with a pin icon, none of them shown yet](https://mintcdn.com/beebole/VvwXLNSbW6lCPUHt/help/images/gantt/columns-menu.webp?fit=max\&auto=format\&n=VvwXLNSbW6lCPUHt\&q=85\&s=ac5ced7be983e81c46d10aac37087f99)

The Columns submenu: click a column to show or hide it, a dark pin marks the columns shown

| Column | What it shows |
| - | - |
| **Row #** | Sequential row number, used to type dependencies |
| **Task Name** | The task name and hierarchy controls |
| **Dependencies** | Row numbers of the tasks this task depends on |
| **Dates** | The task's start and end dates |
| **Owner** | The task's owner |
| **Potential owners** | The people or tags the task is assigned to |
| **Planned** | Planned time, in hours or days |
| **Occupation** | The share of the owner's capacity the task takes, as a percentage |
| **Status** | The task's current status |
| **Tags** | Tags applied to the task |

In addition, one column per [project category](https://beebole.com/help/documentation/projects.md) is available, showing the projects from that category linked to each task.

### Reordering, resizing, and sorting columns

* **Reorder** — Drag a column header sideways and drop it where you want it. **Row #** and **Task Name** stay first and can't be moved.
* **Resize** — Drag the right edge of any column header. Widths are saved with the view.
* **Sort** — Click a column header to sort the rows by that column, click again to reverse the direction, and a third time to return to the manual order. An arrow on the header shows which column is sorted and which way. Hovering a header opens its menu, which names the same actions: **Sort ascending**, **Sort descending**, and **Hide column** (**Task Name** can't be hidden).

Sorting and grouping work together: with a grouping active, the sort applies inside each group, and subtasks always stay under their parent. While a sort is active, the **Row #** column shows plain sequence numbers instead of the handles used to drag rows into a manual order — click the **Row #** header, or **Manual order** in its menu, to get them back.

![Beebole Gantt task columns with the Task Name header menu open, showing Sort ascending and Sort descending over the first rows of the Main plan](https://mintcdn.com/beebole/FZmJbLXQ-vGqqEHj/help/images/gantt/column-sort-menu.webp?fit=max\&auto=format\&n=FZmJbLXQ-vGqqEHj\&q=85\&s=fa2b01d8b01e4b333302ca1d55fd0fed)

The Task Name header's menu, opened by hovering it

> [!TIP]
>
> For long lists, the [List view](https://beebole.com/help/documentation/task-list.md) shows these same columns as a full-width sortable table, without the timeline taking up half the screen.

### Editing in the columns

The value cells are controls, so most task fields can be set without opening the task:

* **Status** — Step to the previous or next status with the chevrons, or click the status name to pick any of them.
* **Owner** — Remove the current owner from its badge, or use the person button on an empty cell to pick someone (**Select the owner**).
* **Dates** — Click the cell to open the task's period editor.
* **Planned** and **Occupation** — Type the figure straight into the cell.
* **Potential owners** — Hover the row for two buttons, one to add a person (**Select person**) and one to add a tag (**Select tag**). Each opens its own small editor with the current people or tags as removable badges and a picker to add more.
* **Tags** and each project category column — Click the **+** button for a small editor with the current badges, removable, and a picker to add more.

You don't need an editor to take a person, tag, or project off a task: hover its badge in the row and click the **X** that appears over it (**Unassign**). This works on a single badge and on each badge of a stacked group alike.

To change several tasks in one go, **⌘+Click** (Ctrl+Click on Windows) rows to build a selection, or **Shift+Click** for a range, then change a value on any row inside the selection: every selected task gets it, as a single undo step. **Esc** clears the selection and **Delete** removes every selected task.

> [!TIP]
>
> When a task's bar sits outside the visible timeline, hovering its **Dates** cell shows an arrow pointing left or right — click it (**Show in the chart**) to scroll straight to the bar. This works even when the task lies outside a fixed period: the window moves onto the period holding the task first, keeping the period length you chose.

### Adding tasks in place

You can name new tasks straight in the task list. Hover over a row and click the **+** button next to the task's name: a name field opens under the row, and what you type becomes a subtask of that task. When the chart is grouped, each group header has its own **+** button (**Add Task**), which opens the field at the top of the group; the new task gets the group's owner, status, or project.

Press **Enter** to save the task and open a field for the next one, or paste a list to add several at once. Hold **⌘** (Ctrl on Windows) as you click a **+** to open the full add form instead, with the same values filled in. In a Bookings planning, both buttons open the **Add Booking** form. See [Adding tasks in place](https://beebole.com/help/documentation/planning.md#adding-tasks-in-place) for the details.

***

## Row grouping

Open the **⋯** menu on the active view tab and hover over **Group by** to restructure the list without changing any task data:

* **Owner** — One group per task owner
* **Status** — One group per status
* A project category — Hover its name and pick one of its levels
* A [tag](https://beebole.com/help/documentation/tags.md) category — Hover its name and pick one of its levels

Select **None** to remove grouping. With a grouping active, **Show all groups** also displays empty groups — useful to see owners or statuses that currently have no tasks.

Hover over a group header to show its **+** button, which adds a task at the top of that group with the group's owner, status, or project already set. See [Adding tasks in place](#adding-tasks-in-place).

***

## Saved views

The tabs above the task list are saved views. Each Gantt view stores its own **Period**, **Columns** (which ones, in what order, at what width), sort, and **Group by** settings, plus its filters.

* **Create** — Click **Add a view**, then **Gantt chart**.
* **Reorder** — Drag a tab sideways and drop it where you want it.
* **Rename** — Double-click the tab (or long-press it on a touch screen) and type the new name, or use **Rename** in the tab's **⋯** menu.
* **Duplicate or delete** — Use **Duplicate** and **Delete** in the **⋯** menu. The last remaining view cannot be deleted.

***

## Filtering

Filters narrow the chart to the tasks you want to see — by task, status, owner, potential owner, project, or [tags](https://beebole.com/help/documentation/tags.md).

Filters are set per view, from the menu on the view's tab:

**1. Open the view menu**

On the **Planning** page, click the **⋯** button just right of the name of the view tab you're on.

**2. Choose Filters**

Click **Filters**. A filter panel opens under the tab, with the fields you can filter on listed on the left.

**3. Set the condition**

Pick a field, such as **Owner** or **Project tag**, then a condition (**is** or **is not**, or **contains**, **starts with**, **ends with** for a name) and the value.

**4. Add the filter**

Click **Add filter**. The filter appears as a badge in a row under the view tabs, and the view updates right away. **⌘+Click** (Ctrl+Click on Windows) on **Add filter** keeps the panel open to add another one.

The row of filter badges under the tabs is where you change them:

* Click the **+** button (**Add filter**) at the end of the row to add another filter.
* Click the **✕** on a badge to remove that filter, or **Remove all** once there are two or more.
* Click **And** or **Or** between two badges to switch how they combine.

Once the view has filters, a funnel button appears next to the **⋯** button. Click it to switch the filters off and back on without losing them: its tooltip reads **Disable filters** or **Enable filters**. The filters are saved with the view, so they are still there the next time you open it.

As a shortcut, **Shift**+click a person, project, or tag badge in the view to add it as a filter.

> [!TIP]
>
> From an open task's detail panel, the **Show in the chart** button in the top bar brings the task into view: the chart scrolls smoothly to its row and its bar instead of jumping, and with a fixed period the window first moves onto the period holding the task — so it works even for a task outside the period currently shown.

***

## Keyboard navigation

With the Gantt chart focused, you can work without the mouse:

| Key | Action |
| - | - |
| **Arrow Down** / **Arrow Up** | Move the cursor to the next or previous row |
| **Arrow Right** | Expand the selected task and move into its first child |
| **Arrow Left** | Collapse the selected task, or move up to its parent |
| **Shift+Arrow** | Extend the selection as a range up to the task you land on, like **Shift+Click** |
| **⌘+Arrow** | Add the task you land on to the selection, or drop it, like **⌘+Click** (Ctrl on Windows and Linux) |
| **Enter** | Open or close the detail panel of the selected task. While the panel is open, it follows the cursor as you move, except while you are building a selection |
| **Tab** | Make the selected task a subtask of the task above it |
| **Shift+Tab** | Move the selected subtask up one level |
| **⌘+A** | Add a new task — a subtask if a task is open |
| **Esc** | Clear the selection, or leave dependency mode |
| **Delete** / **Backspace** | Remove every selected task |

The same keys work in all four views of the **Planning** page. On the [Kanban board](https://beebole.com/help/documentation/kanban.md), **Arrow Down** and **Arrow Up** walk the cards of a column and **Arrow Right** and **Arrow Left** step to the neighboring column; on the [Staffing view](https://beebole.com/help/documentation/staffing.md), the arrows jump from bar to bar. Expanding and collapsing with **Arrow Right** and **Arrow Left**, and indenting with **Tab** and **Shift+Tab**, only apply in the two tree views: the Gantt chart and the [List](https://beebole.com/help/documentation/task-list.md).

> [!NOTE]
>
> Keyboard navigation works when the view has focus. Click anywhere in the task list first if the keys are not responding.

***

## Related content

> [card] [Tasks](https://beebole.com/help/documentation/planning.md)
>
> What tasks are in Beebole — creating, importing, assigning, and tracking time on them.

> [card] [Kanban board](https://beebole.com/help/documentation/kanban.md)
>
> Move the same tasks through status columns with drag and drop.

> [card] [List view](https://beebole.com/help/documentation/task-list.md)
>
> The same columns as a sortable, full-width table, with mass edits across selected rows.

> [card] [Work schedules](https://beebole.com/help/documentation/work-schedule.md)
>
> Define the working hours that determine each person's capacity in the heatmap.

## Frequently asked questions

> [accordion] Does Beebole's Gantt chart have a month view?
>
> No. The Gantt timeline runs **Infinite by day** or **Infinite by week**, selected under **Period** in the view tab's menu — the week granularity is the one to use for a long-range overview. The same menu can also lock the view to a fixed window of **Day**, **Week**, **2 weeks**, **3 weeks**, **4 weeks**, or **6 weeks**, fitted to your screen and paged one period at a time.

> [accordion] How do I create a dependency between two tasks?
>
> Either drag the chain-link handle from the end of one bar onto another task, or click the **Dependencies** cell of the task that should come second and then click the task it depends on (hold **⌘** to pick several) or type its row number. Press **Esc** to finish. Beebole draws an arrow between the bars.

> [accordion] What happens to dependent tasks when I move their predecessor?
>
> It depends on the option chosen under **Dependent tasks** in the view tab's **⋯** menu: **Free** leaves dependents in place, **Pushing** pushes them later when the predecessor would overlap them, and **Together** moves them along with it. The choice belongs to the planning, so it applies to every Gantt and Staffing view of that planning.

> [accordion] Can I have several Gantt views with different columns?
>
> Yes. Click **Add a view** and select **Gantt chart**. Each saved view in Beebole keeps its own columns — which ones, in what order, at what width — plus its sort, grouping, scale, and filters, so you can switch between setups without reconfiguring anything.

> [accordion] Do changes in the Gantt chart affect the Kanban board?
>
> Yes. Both views display the same tasks from the same planning. Dates set on the Gantt timeline, status changes, and renames are immediately visible on the Kanban board, and vice versa.